Construction Status

As of May 22, 2023, the status of the citywide improvements are as follows: 

Completed

  • Sports fields and courts lighting replacements at 
    1. Dublin Sports Grounds
    2. Emerald Glen Park (including the skatepark)
    3. Fallon Sports Park
    4. Kolb Park
  • Solar panel installation at
    1. Corporation Yard
    2. Dublin Library
    3. Fallon Sports Park
    4. Fire Station 17 & 18
  • Heating and air conditioning replacement and/or controls upgrade at 
    1. Dublin Library
    2. Fire Station 16, 17 & 18
    3. Heritage Park and Museum
    4. Senior Center
  • Pool control systems firmware upgrade at 
    1. The Wave 
  • Interior and exterior LED lighting replacement at 
    1. Corporation Yard
    2. Dublin Library
    3. Dublin Sports Grounds (exterior)
    4. Emerald Glen Park
    5. Fallon Sports Park
    6. Fire Station 16, 17 & 18
    7. Kolb Park (exterior)
    8. Senior Center
    9. Shannon Community Center 
    10. The Wave 
  • Park Lighting (non-sports fields and courts lighting) upgrades at
    1. Bray Commons Park
    2. Dolan Park
    3. Emerald Glen Park
    4. Heritage Park and Museum
    5. Shannon Park
  • Street Lighting at the Dublin Ranch Special District
  • Resiliency (generators) at
    1. Fire station 16

In Progress

  • Solar panel installation at
    1. The Wave (along with battery energy storage system) 
    2. Senior Center
    3. Dublin Sports Grounds
  • Traffic Signal Resiliency (batteries & fuel cells)
  • Battery Energy Storage System
    1. Corporation Yard
  • Resiliency (generators) at
    1. Dublin Library
    2. Shannon Community Center
  • Park Lighting (non-sports fields and courts lighting) upgrades at
    1. Alamo Creek Park
    2. Mape Memorial Park
    3. Ted Fairfield Park
  • Electric Vehicle Charging at
    1. Dublin Sports Grounds

Upcoming

  • Solar panel installation at
    1. Civic Center (along with battery energy storage system)
    2. Public Safety Complex
  • Resiliency (generators) at
    1. Fire Stations 17 and 18 (replacement)
  • Electric Vehicle Charging at
    1. Public Safety Complex (fleet)