Status Update (September 2021)

Construction is nearing completion, with the majority of the slurry seal application completed at the end of August 2021. The project has rehabilitated approximately 80 street segments and over 28,000 square feet of asphalt base repairs, with over two million square feet of slurry seal installed.  Remaining work includes traffic striping and markings, which will be completed in September 2021.

Overview

The City of Dublin has contracted with American Asphalt Repair and Resurfacing Co. Inc. for the 2021 Annual Slurry Seal.  This Alameda County Measure B/BB-funded project will include sealing of existing cracks, pavement repairs, new slurry seal, and pavement markings.  During several phases of work for this project, parking and lane closure restrictions will be in place.  The contractor will post “No Parking” signs a minimum of 72 hours (3 days) in advance of the scheduled work on the street.  Streets will be opened to traffic and access to driveways will be available at the end of each day.  The Contractor will schedule the work to minimize disruption to your normal garbage pickup.  

How will this work affect you as a resident or business?

On the day your street is noticed to be slurry sealed it will be closed to traffic and you will not be allowed to drive, walk, or ride a bike on the asphalt street until the slurry seal has properly cured and the road is reopened.  If you need to use your vehicle on the day your road is closed, please park it on an adjacent street not being sealed that day.  Please look for the “No Parking” restrictions.  It is very important that you do not drive or walk on freshly installed slurry.  Slurry seal will stick to the vehicle and will track onto sidewalks, driveways, carpet and flooring and will damage those finishes.

Parking

While the work is in progress, the City’s contractor may need to prohibit parking on the street. The contractor will post “No Parking” signs a minimum of 72 hours (3 days) in advance of the scheduled work on your street.  Please be aware that, due to the possibility of unforeseen circumstances, such as equipment breakdowns, the posted dates and times could change.  You may continue to park on the street until the date and time shown on the signs.  We appreciate your cooperation in adhering to the temporary ‘No Parking’ restrictions.  If you are planning to be out of town during the time that the work is to take place, please arrange to park your vehicle(s) off of the street to avoid having your vehicle(s) towed.  Emergency vehicles will have access to the streets at all times.

Driving on the Street  

During several of the construction activities for this project, street access maybe intermittently restricted.  Streets will be opened to traffic and access to driveways will be available at the end of each day. 

Street Closure

During the slurry seal process, your street or a part of your street will be closed to vehicular traffic for a period of 4-6 hours to allow the material to be installed and dry. 

If you would like to contact American Asphalt Repair and Resurfacing Co. Inc. directly please feel free to call: (510) 723-0280.  We apologize in advance for any disruption caused by this work. Thank you for your cooperation as the City of Dublin invests in maintaining your streets.

  1. Public Works Department


    Phone: 925-833-6630

Project Documents